2-19-2023 Stairs, Railing, Driveway

Last week the floating stairs and railing were partially installed. There is a bit more left to do. And the ground dried out enough that the crew was able to build the driveway and fire turnaround. The drive is constructed of road base, that will compact down to a firm surface free from mud. 

Stairs and Rails, Feb 2023
Stairs and Rails
Driveway, Feb 2023
Driveway
Turnaround, Feb 2023
Turnaround

Add a comment

HTML code is displayed as text and web addresses are automatically converted.

They posted on the same topic

Trackback URL : http://bluffbarndo.calsage.com/blog/index.php?trackback/62

This post's comments feed

Page top