2-19-2023 Stairs, Railing, Driveway
By Permalink
-Last week the floating stairs and railing were partially installed. There is a bit more left to do. And the ground dried out enough that the crew was able to build the driveway and fire turnaround. The drive is constructed of road base, that will compact down to a firm surface free from mud.
Last comments