3-05-2023 Getting close: Plumbing, Electrical, Pellet Stove, Cabinets, Granite, Backsplash

A lot has happened since the last post. Last week saw final plumbing, and electrical being put in. Toilets placed, switches and outlets in as well as all lighting fixtures. Also we had the microwave drawer, range and refrigerator put in. We think this week we can get a certificate of occupancy by week end. 

Kitchen.jpg, Mar 2023
Heat Pump Water Heater.jpg, Mar 2023
Pellet Stove.jpg, Mar 2023

 

Add a comment

HTML code is displayed as text and web addresses are automatically converted.

They posted on the same topic

Trackback URL : http://bluffbarndo.calsage.com/blog/index.php?trackback/63

This post's comments feed

Page top