March 2023

Sunday, March 5 2023

3-05-2023 Getting close: Plumbing, Electrical, Pellet Stove, Cabinets, Granite, Backsplash

A lot has happened since the last post. Last week saw final plumbing, and electrical being put in. Toilets placed, switches and outlets in as well as all lighting fixtures. Also we had the microwave drawer, range and refrigerator put in. We think this week we can get a certificate of occupancy by week end.   ...

Continue reading...

Tuesday, March 14 2023

3-14-2023 Floor Reveal, Nailed the Pex, Blower Door Test, Propane Tank

The Ram Board that has been protecting our floor over the past several months is being pulled up to reveal our finished conctrete floors. It's good to get rid of the dust and debris from all the drywall and construction work. The only remaining job to do before final inspection is to get our master shower floor grouted.  Saturday we hooked up our wash machine and tested it. During this we noticed water coming out under the trim in the laundry room. After our GC opened several holes we discovered that a nail had penetrated the hot water supply. It losened when we ran the hot water for the washer.  On a very positive note, we passed the blower door test. The technician said this is the...

Continue reading...

Monday, March 20 2023

3-20-2023 Final Certificate of Occupancy and RV Move

We got the CO last week, and moved the RV up here on Sunday. The PODs will arrive this week and we'll get them unloaded.  Here's a link to the time lapse video of the kitchen and floors getting finished.   ...

Continue reading...