Sunday, March 5 2023
3-05-2023 Getting close: Plumbing, Electrical, Pellet Stove, Cabinets, Granite, Backsplash
By
A lot has happened since the last post. Last week saw final plumbing, and electrical being put in. Toilets placed, switches and outlets in as well as all lighting fixtures. Also we had the microwave drawer, range and refrigerator put in. We think this week we can get a certificate of occupancy by week end. ...
Last comments