11-20-2022 Drywall!

We have finally reached the point where the drywall installation is beginning. We passed the shear wall inspection and immediately loaded in the drywall and our drywall installer began on Saturday. What a wonderful milestone. Meanwhile after receiving the water test results from the well water sample, we settled on a local water treatment supplier for an iron and softener treatment system. We've also settled on the remaining fans we are installing in the great room and upstairs -- we already have all the bedroom fans. More on that later. 

Drywall Great Room., Nov 2022
Drywall Great Room.
More Drywall, Nov 2022
More Drywall

 

Add a comment

HTML code is displayed as text and web addresses are automatically converted.

They posted on the same topic

Trackback URL : http://bluffbarndo.calsage.com/blog/index.php?trackback/53

This post's comments feed

Page top