Barndo on A Bluff Episode 1 - Pad Preparation
By Permalink
-
Click on this link below to view the video
Here is the first construction camera post. The time frame is from after surface grubbing through to road base build up on the level pad. The final pad will be six inches above the native soil and will prepare the pad for the foundation pour. Note the horses on the hill behind us at 1:22 into the video. Click on the square to view the video full screen.
Last comments