The last weeks have seen most of the plumbing has been topped out. We also had all the vents routed to a single roof penetration that is behind one of the cupolas. There are a few areas of work still. One garage door lifter was installed, making garage access for larger equipment easier. Finally, we had a night visitor trip the camera alarm. 