8-14-2022 First Floor Framing and Ghostly Visitor

The first floor framing is nearly finished so we can now walk through each room and closet. And we had a ghost visit us by coming up the driveway.

Front Office, Aug 2022
Front Office
Firewall.jpg, Aug 2022

 

 

Add a comment

HTML code is displayed as text and web addresses are automatically converted.

They posted on the same topic

Trackback URL : http://bluffbarndo.calsage.com/blog/index.php?trackback/44

This post's comments feed

Page top