06-19-2022 The Fix is In

Last post we reported that there were issues with the front patio truss height. We and Worldwide Steel came up with a solution to extend the column height by adding I Beam shim to the bottom of the column. The CEO of WWS was concerned about the look of the column, but we assured him it was not a problem since the trusses will all be enclosed and wrapped in stone. Installing the shims allowed our guys to continue the roof framing and build into the front to side hip joint. 

Meanwhile as the crew builds, Mrs. BluffBarndo met up with the Pony Express rider that travelled through town. 

 

I Beam Shim, Jun 2022
I Beam Shim
Hip Joint, Jun 2022
Hip Joint
Pony Express, Jun 2022
Pony Express

 

Add a comment

HTML code is displayed as text and web addresses are automatically converted.

They posted on the same topic

Trackback URL : http://bluffbarndo.calsage.com/blog/index.php?trackback/39

This post's comments feed

Page top