2-06-2022 Monoslab Photo and Patio Foundation

This week was slower than the last few weeks. The crew laid out the patio foundation and extensions beyond that outer perimieter. I asked that two 2" conduit chases be placed under the patio slab for low voltage cables and fuuture solar, and they of course, had to run the sewer/septic, water and pump power out of the perimiter of the slab. The front of the patio has structural footings that need to be constructed and rebar placed therin. Also to be poured will be the garage apron of 25 feet. This is a lot of concrete but will be worth it in the long run and for a long time. 

Monoslab Vista, Feb 2022
Monoslab Vista

Monoslab and Patio Trecnching.JPG, Feb 2022

 