12-28-2021 Foundation Footings and Rough Plumbing - Construction Video Episode 2

BOAB - Episode 2 Panorama, Dec 2021
BOAB - Episode 2 Panorama
BOAB Episode 2

Since the last episode 1 video, the crew has trenched for the foundation footings, constructed outer forms and insulation, and rough plumbing. We happended to be there when this stage passed inspection. Since then, it has been raining and showing quite a bit, stopping progress...for now.  Click here or on the picture to view the Episode 2 time-lapse video. 

 

 

Add a comment

HTML code is displayed as text and web addresses are automatically converted.

They posted on the same topic

Trackback URL : http://bluffbarndo.calsage.com/blog/index.php?trackback/17

This post's comments feed

Page top