10-02-2022 More Plumbing and Garage Door Work

The last weeks have seen most of the plumbing has been topped out. We also had all the vents routed to a single roof penetration that is behind one of the cupolas. There are a few areas of work still. One garage door lifter was installed, making garage access for larger equipment easier. Finally, we had a night visitor trip the camera alarm.   ...

Continue reading...

Saturday, October 15 2022

10-15-2022 Sprinklers, Lighting, Exterior Doors

The past two weeks have seen all the recessed lighting cans installed. That allowed the fire sprinklers to be installed next. Meanwhile, K&C installed two exterior doors including the front door.  Light Cans and Sprinklers Front Door  ...

Continue reading...

Saturday, October 29 2022

10-20-2022 Driveway Pad and More Electrical

This week the driveway pad was poured, In addition, walkways were added to connect the pad to the front and back patios. Electrical rough-in is nearly complete with the sub-panel being installed, and power from the main to the sub-panel. Additionally, the wider garage door opener and springs were installed. Next week we anticipate a interior framing inspection then on to final insulation. Sub Panel Garage Door Wide  ...

Continue reading...