8-06-2023 Floor is Done, Framing has begun

Our sealed floor is performing very well. It is so non-pourous and sealed that the crew used three colors of chalk. First yellow, then green, and finally red. The green just powerderd on the floor leaving no line at all. I had drilled into the GC to not use red on the concrete so he was surprised and concerned when his framers used red chalk. No worries, however, as even the red barely worked on the floor. A simple wipe removes the red chalk. I would recommend to any barndo builder that wants bare polished concrete to use the Hiperguard as the final sealer. It is designed for industrial and commercial concrete flooring.  You can see the floor layout chalk marks in the photo. Also shown is...

Continue reading...

Sunday, August 14 2022

8-14-2022 First Floor Framing and Ghostly Visitor

The first floor framing is nearly finished so we can now walk through each room and closet. And we had a ghost visit us by coming up the driveway. Front Office    ...

Continue reading...

Sunday, August 28 2022

8-28-2022

Second floor deck and framing are underway. Looking at the views from upstairs.  Upstairs Framing Valley View Sierra View  ...

Continue reading...

Page top